Project Protection [MME Buildings]
Project name: MME Buildings
Project owner: sambanks57
Project location (coordinates): x: 2768 y: 71 z: -3740
Approximate dimensions: First corner x: 2684 y: 5 z: -3776
Second corner x: 2790 y: 256 z: -3685
What is the current state of the project? And what are your plans for its future, if any: The current state of the casino is completed with only minor changes on occasion in the interior. The state of the tower is only begun as the exterior and interiors are both in construction. Future plans include interior designing and changes at times and small scale for the casino. The tower, however, will be continued as it is only 20%-30% completed with the exterior being unfinished and the interior completely empty.
Why should your project be granted project protection? Our project should be granted project protection because of the constant threat of griefing and information theft as new entrepreneurs and even old customers often try to glitch, and even grief inside to steal the redstone wiring patterns.
Screenshots:View Of The Tower From A Far
View Below The Tower
View From Outside The Casino
View From In The Casino
View From Under The Casino
View From The Labs
View From The Top Of The Tower